House Machado
Civil and structural engineering for a residential redevelopment in East London, including foundations, timber-and-steel structures and stormwater planning.
- Location
- East London
Civil and structural engineering for a residential redevelopment in East London, including foundations, timber-and-steel structures and stormwater planning.
New school block and vehicle drop-off zone, inception to close-out.
Five buy-back centres feeding a central buy-back and transfer station.
Structural engineering and project management for a 12 m climbing and abseiling structure at Lilyfontein School.
New boreholes, 5 km rising main, 1 Ml/d brack-water RO plant and brine pipeline.

±5 760 m² cheese factory and cold room, canteen floors and ±7 700 m² hardstand.
±1 620 m² mezzanine, ±600 m² foaming cell and despatch area upgrades.

Design and construction of a new science centre.

Five factories: ±41 500 m² floor, ±3 750 m² offices, ±17 900 m² hardstand.

Fast-track delivery of a ±19 000 m² electronics factory with a ±5 000 m² clean room, offices, cafeteria and full external works.

Landfill site, sorting facility, operating plan, guardhouse upgrade and weighbridge.

Geometric and structural design of paved roadways Water reticulation system Sewer reticulation system and pumpstation Stormwater drainage system and stormwater management plan Structural design of single storey free standing units

Geometric and structural design of paved roadway Geometric and structural design of concrete base roundabouts Water reticulation system Sewer reticulation system Stormwater drainage system

Design of 25m long swimming pool Entrance courtyard consisting of: Concrete koi tank Concrete floating stairways
Two 3 ML steel reservoirs and a 16 ML raw-water dam, design to close-out.
Design-build-operate (FIDIC) 2 ML/day seawater RO plant and 3 ML/day water re-use RO plant.
Raft foundations on expansive clays, RC frame, elevated water tank, retaining walls, platforms and services for a new school.
Water treatment works, bulk pipelines, borehole scheme and new steel reservoirs, inception to close-out.
Upgrade of the Bathurst bulk sewer.
Security fencing at the Teko and Centane campuses.
Valves, PRVs, bulk meters, booster pump stations and pipeline upgrades.
Township roads, stormwater, attenuation pond, water and sewer reticulation.
Let's discuss your requirements and explore how Newground Projects can help.